GENERATION

Lakefront’s Net Metering Program

Lakefront’s Net Metering program is available to any customer generating electricity primarily for their own use.  The generation must be from a renewable energy source such as wind, water, solar, agricultural biomass.  If your generation facility is greater than 10 kW, a Connection Impact Assessment must be completed.

The Ontario Energy Board has outlined the connection process in the Distribution System Code  which can be accessed here.

To get started on the application process, please fill out the Form C Net Metering Application

Once connected to Lakefront’s distribution system, we will start reading your meter(s), monthly.  Lakefront will then subtract the value of electricity you supply to the grid from the value of what you take from the grid.  What you’ll see on your monthly bill is the “net” difference between these two amounts. If you supply more power than what you take from the grid over the billing cycle, you’ll receive a credit towards future energy bills.  Available credits will be applied, as required, but will not exceed the value of electricity consumed from Lakefront’s grid.  Credits carried for 12 consecutive months will expire.  Unused credits will be reduced to $0.00.  HST will be applied to your monthly bill based on the gross supply of electricity, not the net supply.

For more information, please contact us at lusi@lusi.on.ca.

 

Venture 13 - 739 D'Arcy Street, Cobourg, ON
Real-time Solar Output: 1023.7 W
Total Output Today: 198.9 kWh
Last Updated: 2024-04-19 19:34:23
Cobourg Water Treatment Plant - Cobourg, ON
Real-time Solar Output: 426.8 W
Total Output Today: 77.2 kWh
Last Updated: 2024-04-19 19:31:29

LOCATION

207 Division Street
PO Box 577
Cobourg, Ontario
K9A 4L3

Call Us

(905) 372-2193

FAX US

(905) 372-2581

EMAIL US

lusi@lusi.on.ca
Skip to content